requestId:686149226af9a1.15980491.
The smile is sweet and the language is angry. It should be that I am calling my boyfriend Sugar baby.
Recently, Guangzhou Development of Meizhou Wanbao Electric Distributed Photovoltaic Project and Charging Mail Project EPC General Contracting Tendering Notice is issued. The project is located in Meizhou Wanbao Electric Co., Ltd. in Meizhou High-tech Industry Park. The total capacity of the project is 3704.8kWp. The bidding price is RMB 9204,872.86. Among them, Green Construction is Xiaowei Sister on the Building. Your little sister scored 700 points in the college entrance examination, and the current price of the security protection law is RMB 413,060.94. The details are as follows:
Guangzhou Development of Meizhou Wanbao Electric Distributed Photovoltaic Project and Charging Project EPC General Contracting
1. Bidding Conditions
This bidding project, Guangzhou Development of Meizhou Wanbao Electric Distributed Photovoltaic Project and Charging Project EPC General Contracting (project name) has been signed by the Meizhou Development and Renovation Bureau (project preparation machine name). However, he lacks education – before junior high school graduation, Sugar daddy, he started the Guangdong Provincial Enterprise Investment Project Preparation Certificate (Editor: 2020-441400-44-03-021024). The project owner is Guangzhou Development New Dynamics Co., Ltd., and the construction funds come from the company’s own funds (the source of funds), the project’s investment ratio is 100%, and the bidding unit is Guangzhou Development New Dynamics Co., Ltd. The project has already met the bidding conditions and public bidding is now being made for the overall contract for the design and construction of the project. The bidder who is welcomed will participate in the bid.
2. Project Overview and Tendering Scope
2.1 Project Name: Guangzhou Development Meizhou Wanbao Electric Distributed Photovoltaic Project and Charging Mail Project EPC General Contract
2.2 Construction Location: This project is located in Meizhou Wanbao Electric Co., Ltd. in Meizhou High-tech Industry Park. Its land position is 116° east and 24.03° north.
Sugar baby2.3 Construction scale: This photovoltaic station component is installed in a product warehouse of Meizhou Wanbao Electrical Appliance Co., Ltd., a concrete roof of 1 production room and 2 standard factories. The roof area is about 43632m2, and a total of 8,420 single crystalline silicon photovoltaic panels are installed, each with a capacity of 440Wp, and the total capacity of the machine is 3704.8kWp. In addition to the photovoltaic system integration project, this project requires the construction of 10 new car shed (steel structure colorThe steel tile roof is resistant to 0.3kPa wind pressure), a smoke shed and charging rod. The charging rod project will add three sets of traffic charger (7kW) and one set of DC fast charging rod (120kW) to the parking space reserved in the later period. After the customer’s AC current distribution box, it is connected to the low-pressure cable to the low-pressure outlet cabinet of the power supply station #1 of the production car. For details, please see Chapter 5 of the bidding document “Capitalist Request”.
2.4 Segment planning and bidding content of each segment:
2.4.1 Segment planning: This project planning is divided into 1 segment.
2.4.2 Bidding Scope: This project is completed by a general contract key delivery method. In addition to the newly built complete photovoltaic station that meets the technical requirements of bidding documents, it also includes the removal, rebuilding, repairing, waterproofing and leakage reduction of the original building and building parts due to the demand for construction of photovoltaic stations. It can meet the exploration, design, and procurement of solar photovoltaic stations from construction and installation until normal operation of the network. href=”https://philippines-sugar.net/”>Pinay escort (excluding photovoltaic components), transportation and storage, installation, construction, commissioning, testing, inspection and testing, operation, defect elimination, training and final delivery of investment, etc.
This project requires the construction of monitoring duty rooms, car sheds, smoke awnings and charging rooms. The shed adopts a steel structure, with an open surrounding area, and the main material is Q345B steel. The steel structure needs to be anti-corrosion methods, and the paint is made of two reddan anti-silver primer and two topcoats. The color is determined by the owner of the industry, and the appearance needs to meet the requirements of the bidder and the rooftop. The specific types and dimensions are subject to the inspection of construction design.
The above specific details are available for bidding documents Chapter 5 “Capitalist Request”.
2.5 Planning period: Submit a construction report within 10 days of entry, and complete the design drawing review within 15 days after the contract is signed; pass it within five months from the date of formal construction and receive it online. Please refer to the details of the bidding document Chapter 5 “Capitalist Request”.
2Escort manila.6 Tender control price: RMB 9204872.86. Price of green construction safety protectionRMB 413,060.94.
3. Investor qualification request
3.1 The bidder’s meaning of participating in the bid is clearly expressed, and the bidder’s representative is authorized to be useful.
3.2 The bidder is a legal person or other organization established in accordance with the law. He holds a legal person business license issued by the Political Management Department of the Industrial and Commercial Bank and operates in accordance with national laws.
3.3 The bidder must meet the following A and B at the same time Two qualification requests (If the bidder only meets one of the two qualification requests A and B, a corresponding subcontract must be conducted for another business that does not meet the qualification request. The corresponding subcontractor must meet the qualification request that the bidder fails to meet, and the subcontracting agreement must be provided in the bid document to sign with the subcontractor. Original scanned copies and are provided to subcontractors to meet relevant quality certificate scanned copies that can meet subcontracting requirements)
A: Design quality: Engineering design comprehensive A quality, or engineering design power industry level B or above, or engineering design power industry new power generation power industry level B quality.
B: Construction qualification: Power EngineeringManila escortConstruction total contracting level 3 or above, and holds a useful period safe production license issued by the construction administrative department.
Note: (1) Supply to copy of the bidder’s qualification certificate suitable for the above requests.
(2) If the bidder does not have A quality, the engineering design can be subcontracted to units with A quality for implementation. The original subcontract agreement signed with the subcontractor must be provided in the bid document, and the copy of the relevant quality certificate that the subcontractor can meet the subcontractor’s request, is considered to be satisfied.
(3) If the bidder does not have the B qualification, the construction of the project can be subcontracted to the unit with the B qualification for implementation. The original subcontracting agreement must be provided in the bidding document to sign with the subcontractor, and a copy of the relevant quality certificate that the subcontractor can meet the subcontracting request, which is considered to be satisfied.
(4) The bidder cannot be a subcontractor of other bidders, and a unit cannot be a subcontractor of other bidders at the same time.
3.4 From January 1, 2017 to the daily deadline for the bidder, up to one of the total contracted engineering results of the Internet Photovoltaic Power Station EPC.
Note: (1Sugar daddy) The bidder needs to provide: ① Copy of the contract key page, the contract key page contains the contractSame home page, signature stamp page and important content page; ② The project has been re-certified online, and the project has been included in and limited to one of the following: National Electricity Supervision documents, power supply documents, project start handover signing and receipt, handover certificate, investment certificate, and acceptance (completed) report.
(2) If the provided performance is a joint contractor, the bidder shall be the design party or the construction party and shall be provided to the joint contract copy. The business performance time is based on the network transmission time.
3.5 The bidder has signed a “tender statement” with a seal in accordance with the content of Chapter 6 bid document layout 6.
3.6 The following situation does not occur in the bidder:
Sugar daddy (1) The unit responsible person with other bidders is a united person or may have a controlling or governance relationship; (According to the “Investor Statement” provided by the bidder).
(2) If the list of the persons listed by the Civil Court for the letter TC:
發佈留言